CN
CN
Intelligent manufacturing workshop
2022-11-10 | ZhongYe JiDian | 332 View

High end hydraulic component manufacturing digital workshop of Sinohydro Corporation

 

Assembly:

Control valve body assembly

Swing base subassembly

Front pump main shaft subassembly

Rear pump main shaft subassembly

Rear pump housing subassembly

Front pump housing subassembly

Shaft end cover subassembly

Mounting base assembly

 

clean:

1. Automatic industrial saturated steam cleaner is installed in the cleaning station to control the cleanliness of parts;

2. After manual cleaning, it takes 2 hours to send samples to the laboratory to monitor the cleanliness. The full-automatic cleanliness detection system can display the real-time cleanliness of the product online, which can be completed within 4-8 minutes.

 

Warehouse establishment:

1. Improve the space utilization rate. The automated warehouse is densely stored and has high space utilization rate;

2. It is convenient to form an advanced logistics system and improve the production management level of the enterprise;

3. Accelerate the turnover rate of goods, reduce the workload of warehousing staff, and improve the overall warehousing efficiency.

Home Product Equipment Contact